Representation of a publicly traded company in the failure and complete loss of a newly constructed building. The design and construction were so severe that within a few days of the building's grand opening, construction ceased and it was determined the building could not be saved. Was successful in resolving a portion of the dispute with the design team, and recovered the remainder of the costs necessary to demolish and replace the building, plus lost profits and other damages.